Dàta Tuarastail H-1B

Dachaigh › Bailtean › Georgia › Berkeley Lake

Luchd-taic H-1B ann an Berkeley Lake, GA

Chuir luchd-fastaidh 77 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Berkeley Lake, GA ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $83,500.

Iarrtasan (LCAs)77
Tuarastal meadhanach a chaidh a thabhann$83,500
Leath mheadhanach nan tuarastalan$83,500–$100,000
Ceudail 10mh–90mh$79,985–$102,900

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Prìomh luchd-taic

Neach-obrachLCAsTuarastal meadhanach
Topstars, Inc.24$102,900
Trinity Consulting Inc14$83,500
Compusoft Integrated Solutions, Inc11$83,500
Real Soft Inc11$83,500
Solgenie Technologies, Inc.9$87,000
Spark Cloud Inc4$89,877
New Space Design, Inc.3$56,000
Shepherd Animal Hospital LLC1$80,000

Gnìomhan

Tiotalan dreuchd

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).