Dàta Tuarastail H-1B

Dachaigh › Bailtean › New Jersey › Cedar Grove

Luchd-taic H-1B ann an Cedar Grove, NJ

Chuir luchd-fastaidh 31 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Cedar Grove, NJ ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $112,039.

Iarrtasan (LCAs)31
Tuarastal meadhanach a chaidh a thabhann$112,039
Leath mheadhanach nan tuarastalan$82,000–$162,090
Ceudail 10mh–90mh$71,797–$203,629

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Prìomh luchd-taic

Neach-obrachLCAsTuarastal meadhanach
Inglese Architecture and Engineering LLC6$75,000
LB Electric Co, LLC4$107,080
Ernst & Young U.S. LLP4$239,296
Inglese Architecture and Engineering L.L.C.2$70,000
AR Solutions, Inc.2$115,918
National Railroad Passenger Corporation1—
PaperCut Services North America1$122,402
Tender Touch Rehab Services LLC1$94,910
Guy Carpenter & Company, LLC1$127,054
Red Hat, Inc.1$166,120
The Bank of Nova Scotia1$185,000
Grove Contracting LLC1$69,971
Anchor Labs Inc.1$200,000
Maplebear Inc.1$150,000
Ho Property LLC1$80,000
Cisco Systems, Inc.1$178,500
Progyny, Inc.1$148,600
UST Global Inc1$104,000

Gnìomhan

Tiotalan dreuchd

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).