Dàta Tuarastail H-1B

Dachaigh › Bailtean › Georgia › Fort Valley

Luchd-taic H-1B ann an Fort Valley, GA

Chuir luchd-fastaidh 50 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Fort Valley, GA ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $78,562.

Iarrtasan (LCAs)50
Tuarastal meadhanach a chaidh a thabhann$78,562
Leath mheadhanach nan tuarastalan$59,166–$88,650
Ceudail 10mh–90mh$52,042–$101,972

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Prìomh luchd-taic

Neach-obrachLCAsTuarastal meadhanach
Blue Bird Body Company24$81,661
Fort Valley State University18$54,000
Infosys Limited5$91,062
HSM Transportation & Specialty Manufacturing Company2$95,000
Hedgehog Foods, Inc.1$102,024

Gnìomhan

Tiotalan dreuchd

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).