Dachaigh › Bailtean › Michigan › Grass Lake
Luchd-taic H-1B ann an Grass Lake, MI
Chuir luchd-fastaidh 23 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Grass Lake, MI ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $112,262.
Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$112,262
Leath mheadhanach nan tuarastalan$97,875–$127,883
Ceudail 10mh–90mh$84,961–$140,785
Prìomh luchd-taic
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Tenneco Automotive Operating Company Inc. | 21 | $113,000 |
| Alten Technology | 1 | $72,883 |
| Tata Technologies, Inc. | 1 | $83,701 |
Gnìomhan
| Gnìomh | LCAs | Tuarastal meadhanach |
|---|---|---|
| Mechanical Engineers | 10 | $103,950 |
| Industrial Engineers | 5 | $99,750 |
| Architectural and Engineering Managers | 5 | $126,195 |
| Purchasing Agents, Except Wholesale, Retail, and Farm Products | 1 | $120,000 |
| Financial Managers | 1 | $190,000 |
| Commercial and Industrial Designers | 1 | $83,701 |
Tiotalan dreuchd
- Senior Engineer3
- Engineering Manager3
- Engineering Supervisor2
- Principal Engineer2
- Warranty Engineer2
- Senior Manufacturing Engineer (Bending CCT Lead)1
- Associate Engineer1
- Automotive Engineer-Battery Components1
- Program Manager1
- Quality Supervisor1
- Commodity Buyer1
- Finance Director1
- CAD Engineer1
- Snr Program Manager1
- Snr Design Engineer1
- Designer1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).