Dàta Tuarastail H-1B

Dachaigh › Bailtean › Washington › Moses Lake

Luchd-taic H-1B ann an Moses Lake, WA

Chuir luchd-fastaidh 45 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Moses Lake, WA ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $106,066.

Iarrtasan (LCAs)45
Tuarastal meadhanach a chaidh a thabhann$106,066
Leath mheadhanach nan tuarastalan$77,000–$153,725
Ceudail 10mh–90mh$55,765–$254,000

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Prìomh luchd-taic

Neach-obrachLCAsTuarastal meadhanach
Sila Nanotechnologies, Inc.7$104,582
Grant County Public Hospital District No. 16$107,432
Wenatchee Valley Medical Group, PS3$325,000
Solis Services LLC3$55,765
Health Carousel LLC3$42,869
REC Silicon, Inc.3$153,300
Clayco, Inc.2$99,210
Thrifty Payless, Inc.2$139,142
Amazon Data Services, Inc2$147,300
Aerospace Testing, Engineering and Certification, Inc.2$207,010
Big Bend Community College1$67,831
AOG Resources LLC1$52,520
Vensai Technologies Inc.1$88,800
J.r. Simplot Company1$64,168
Stanley Cox DMD PS1$500,000
Terex Washington, Inc.1$86,840
Walgreen Co.1$143,250
Araxis Systems Inc1$96,283
Twelve Benefit Corporation1$180,000
Apto Staffing Solutions, Inc.1$95,000
AstaReal Inc.1$86,507
Terex USA, LLC1$128,294

Gnìomhan

Tiotalan dreuchd

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).