Dàta Tuarastail H-1B

Dachaigh › Bailtean › Utah › Springville

Luchd-taic H-1B ann an Springville, UT

Chuir luchd-fastaidh 20 iarrtasan cumhaichean-obrach a-steach airson obraichean ann an Springville, UT ann am bliadhnaichean ionmhais 2023–2026. Tuarastal bunasach meadhanach: $62,500.

Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$62,500
Leath mheadhanach nan tuarastalan$48,625–$87,906
Ceudail 10mh–90mh$35,922–$102,900

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Prìomh luchd-taic

Neach-obrachLCAsTuarastal meadhanach
Nozzle Tech USA, LLC7$54,725
Nebo School District4$58,416
Rock Valley Pavers, LLC2—
Fast Fill Systems1$30,514
IBM Corporation1$115,066
Namify, LLC1$102,000
ATL Technology1$98,000
Reach Reporting, Inc.1$105,000
Precision Millwork1$80,000
Springville City Corporation1$90,542

Gnìomhan

Tiotalan dreuchd

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).