Dachaigh › Luchd-obrach › Adalitek Group, LLC › DevOps Engineer
DevOps Engineer aig Adalitek Group, LLC: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd DevOps Engineer aig Adalitek Group, LLC. Tuarastal bunasach meadhanach $98,904; leth meadhanach $70,720–$98,904.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$98,904
Leath mheadhanach nan tuarastalan$70,720–$98,904
Ceudail 10mh–90mh$70,504–$99,819
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $98,904 |
| FY2024 | 1 | $70,179 |
| FY2026 | 2 | $70,720 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $70,720–$71,000 Ìre II | Garland, TX | 10 Samh 2025 | 11 Samh 2025 | Dearbhaichte |
| $70,720–$71,000 Ìre II | Garland, TX | 10 Samh 2025 | 11 Samh 2025 | Dearbhaichte |
| $70,179–$70,500 Ìre II | Irving, TX | 20 Dùbh 2023 | 21 Dùbh 2023 | Dearbhaichte |
| $101,192–$102,000 Ìre II | Irving, TX | 4 Iuch 2023 | 5 Iuch 2023 | Dearbhaichte |
| $98,904–$99,000 Ìre II | Irving, TX | 18 Màrt 2023 | 19 Màrt 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $98,904–$99,000 Ìre II | Richardson, TX | 18 Màrt 2023 | 19 Màrt 2023 | Dearbhaichte |
| $98,904–$99,000 Ìre II | Irving, TX | 18 Màrt 2023 | 19 Màrt 2023 | Air a tharraing air ais |
| $98,904–$99,000 Ìre II | Irving, TX | 27 Gearr 2023 | 27 Gearr 2023 | Dearbhaichte |
DevOps Engineer aig gach neach-fastaidh →
Obraichean eile aig Adalitek Group, LLC
- Software Developer$91,603
- Data Engineer$95,036
- Sr. Software Developer$89,918
- Java Developer$80,850
- Data Analyst$92,040
- Sr. Software Engineer$99,008
- ETL Developer$98,904
- Tech Lead$78,000
- Quality Assurance Analyst (QA Analyst)$81,328
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).