Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Adobe Inc. › Sales Force Effectiveness Professional

Sales Force Effectiveness Professional aig Adobe Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Sales Force Effectiveness Professional aig Adobe Inc.. Tuarastal bunasach meadhanach $141,844; leth meadhanach $140,422–$146,548.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$141,844
Leath mheadhanach nan tuarastalan$140,422–$146,548
Ceudail 10mh–90mh$135,000–$157,029

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$141,687
FY20253$148,064

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$148,064San Jose, CA11 Màrt 202528 Lùna 2025Dearbhaichte
$165,994
Ìre III
Flower Mound, TX28 Gearr 202523 Lùna 2025Dearbhaichte
$140,000–$155,000
Ìre IV
Chicago, IL26 Samh 20249 Dùbh 2024Dearbhaichte
$130,000–$145,000
E-3 · Ìre IV
Lehi, UT23 Sult 202430 Sult 2024Dearbhaichte
$142,000–$157,000
Ìre IV
Lehi, UT1 Gibl 20241 Dàmh 2024Dearbhaichte
$141,687San Jose, CA20 Màrt 202420 Lùna 2024Dearbhaichte

Obraichean eile aig Adobe Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).