Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Adobe Inc. › Site Reliability Engineer

Site Reliability Engineer aig Adobe Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Site Reliability Engineer aig Adobe Inc.. Tuarastal bunasach meadhanach $135,689; leth meadhanach $127,500–$156,250.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$135,689
Leath mheadhanach nan tuarastalan$127,500–$156,250
Ceudail 10mh–90mh$117,000–$161,500

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20238$135,689

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,000–$150,000
Ìre IV
Lehi, UT3 Cèit 202315 Sult 2023Dearbhaichte
$155,000–$170,000
Ìre II
San Jose, CA20 Gibl 20231 Cèit 2023Dearbhaichte
$160,000–$180,000
Ìre II
San Jose, CA30 Màrt 20237 Sult 2023Dearbhaichte
$120,000–$160,000
Ìre IV
Lehi, UT23 Màrt 202331 Lùna 2023Dearbhaichte
$130,000–$150,000
Ìre IV
Lehi, UT23 Màrt 202315 Sult 2023Dearbhaichte
$110,000–$125,000
Ìre III
Lehi, UT3 Màrt 202330 Lùna 2023Dearbhaichte
$165,000–$185,000
Ìre II
San Jose, CA17 Gearr 202329 Iuch 2023Dearbhaichte
$141,378
Ìre II
San Jose, CA27 Sult 202211 Dàmh 2022Dearbhaichte

Site Reliability Engineer aig gach neach-fastaidh →

Obraichean eile aig Adobe Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).