Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Advanced Energy Industries, Inc. › Field Applications Engineer

Field Applications Engineer aig Advanced Energy Industries, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Field Applications Engineer aig Advanced Energy Industries, Inc.. Tuarastal bunasach meadhanach $103,896; leth meadhanach $93,122–$126,984.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$103,896
Leath mheadhanach nan tuarastalan$93,122–$126,984
Ceudail 10mh–90mh$92,370–$127,419

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$103,896
FY20242$127,346
FY20252$92,496

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$91,869–$111,869Milpitas, CA4 Ògmh 20251 Dàmh 2025Dearbhaichte
$93,122–$113,122
Ìre II
Elmwood Park, IL21 Cèit 20251 Dàmh 2025Dearbhaichte
$127,709–$147,709Redmond, WA21 Cèit 20241 Dàmh 2024Dearbhaichte
$126,984–$166,984
Ìre II
Milpitas, CA6 Cèit 20241 Dàmh 2024Dearbhaichte
$103,896–$133,896
Ìre III
Mount Prospect, IL9 Lùna 20231 Dàmh 2023Dearbhaichte

Field Applications Engineer aig gach neach-fastaidh →

Obraichean eile aig Advanced Energy Industries, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).