Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Aegis Company › Technical Project Manager

Technical Project Manager aig Aegis Company: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Manager aig Aegis Company. Tuarastal bunasach meadhanach $93,246; leth meadhanach $93,246–$104,494.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$93,246
Leath mheadhanach nan tuarastalan$93,246–$104,494
Ceudail 10mh–90mh$93,246–$108,243

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202310$93,246

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$93,246–$93,247
Ìre II
Lacey, WA17 Iuch 202317 Iuch 2023Dearbhaichte
$108,243–$108,244
Ìre II
Redmond, WA14 Iuch 202314 Iuch 2023Dearbhaichte
$108,243–$108,244
Ìre II
Redmond, WA14 Iuch 202314 Iuch 2023Dearbhaichte
$108,243–$108,244
Ìre II
Redmond, WA14 Iuch 202314 Iuch 2023Dearbhaichte

Technical Project Manager aig gach neach-fastaidh →

Obraichean eile aig Aegis Company

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).