Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Allston Contractors, Inc.

Allston Contractors, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Allston Contractors, Inc. 6 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 3. Tuarastal meadhanach a chaidh a thabhann: $83,741.

Iarrtasan (LCAs)6
Dearbhaichte3
Seòladh an neach-fhastaidhAllston, MA
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$83,741
Leath mheadhanach nan tuarastalan$83,502–$87,450
Ceudail 10mh–90mh$83,358–$89,676

A bheil Allston Contractors, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Allston Contractors, Inc. 6 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 24 Iuch 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Construction Supervisor2$83,741
Cost Estimator and Procurement2$83,262
Construction Manager1—
Business Operations Specialist1$91,160

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20245$83,502
FY20251$91,160

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Business Operations Specialist$91,160
Ìre II
Allston, MA24 Iuch 20251 Dàmh 2025Dearbhaichte
Construction Supervisor$83,741
Ìre II
Allston, MA14 Ògmh 20241 Dàmh 2024Dearbhaichte
Cost Estimator and Procurement$83,262
Ìre II
Allston, MA14 Ògmh 20241 Dàmh 2024Dearbhaichte
Construction Supervisor$83,741
Ìre II
Allston, MA11 Ògmh 20241 Dàmh 2024Diùltadh
Construction Manager$111,696
Ìre II
Allston, MA10 Ògmh 20241 Dàmh 2024Diùltadh
Cost Estimator and Procurement$83,262
Ìre II
Allston, MA10 Ògmh 20241 Dàmh 2024Diùltadh

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).