Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Ally Bank › Sr Engineer – Software Test

Sr Engineer – Software Test aig Ally Bank: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Sr Engineer – Software Test aig Ally Bank. Tuarastal bunasach meadhanach $110,261; leth meadhanach $91,692–$115,366.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$110,261
Leath mheadhanach nan tuarastalan$91,692–$115,366
Ceudail 10mh–90mh$85,000–$120,411

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$107,404
FY20241$110,261
FY20258$105,685

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$120,411–$150,000
Ìre IV
Detroit, MI4 Lùna 202513 Lùna 2025Dearbhaichte
$120,411–$150,000
Ìre IV
Detroit, MI17 Iuch 202513 Lùna 2025Dearbhaichte, an uair sin air a tharraing air ais
$85,000–$150,000
Ìre II
Detroit, MI10 Gibl 202530 Gibl 2025Dearbhaichte
$98,384–$150,000
Ìre III
Charlotte, NC4 Gearr 202510 Gibl 2025Dearbhaichte
$115,731–$150,000
Ìre IV
Charlotte, NC6 Samh 202414 Samh 2024Dearbhaichte
$85,000–$150,000
Ìre II
Charlotte, NC30 Dàmh 202411 Samh 2024Dearbhaichte
$112,986–$150,000
Ìre II
Charlotte, NC7 Dàmh 202428 Dàmh 2024Dearbhaichte
$85,000–$150,000
Ìre II
Charlotte, NC13 Sult 202421 Gearr 2025Dearbhaichte, an uair sin air a tharraing air ais
$110,261–$150,000
Ìre IV
Charlotte, NC6 Dùbh 20231 Ògmh 2024Dearbhaichte
$99,807
Ìre II
Charlotte, NC16 Samh 20221 Dùbh 2022Dearbhaichte
$115,000
Ìre II
Charlotte, NC28 Sult 202217 Dàmh 2022Dearbhaichte

Obraichean eile aig Ally Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).