Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Altimetrik Corp. › Full Stack Developer

Full Stack Developer aig Altimetrik Corp.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Full Stack Developer aig Altimetrik Corp.. Tuarastal bunasach meadhanach $109,283; leth meadhanach $92,539–$123,656.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$109,283
Leath mheadhanach nan tuarastalan$92,539–$123,656
Ceudail 10mh–90mh$87,784–$128,424

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$96,948
FY20242$108,098
FY20261$131,602

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$131,602–$150,000
Ìre III
Newark, DE29 Gibl 202611 Cèit 2026Dearbhaichte
$123,656–$150,000
Ìre II
Jersey City, NJ7 Lùna 202419 Lùna 2024Dearbhaichte
$92,539–$110,000
Ìre II
Lehi, UT8 Cèit 20241 Dàmh 2024Dearbhaichte
$84,614–$95,000
Ìre II
Pittsburgh, PA27 Gearr 20239 Màrt 2023Dearbhaichte
$109,283–$120,000
Ìre II
Jersey City, NJ15 Dùbh 202223 Dùbh 2022Dearbhaichte

Full Stack Developer aig gach neach-fastaidh →

Obraichean eile aig Altimetrik Corp.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).