Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Apple Inc. › Engineering NPT Project/Program Management

Engineering NPT Project/Program Management aig Apple Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Engineering NPT Project/Program Management aig Apple Inc.. Tuarastal bunasach meadhanach $143,749; leth meadhanach $137,798–$145,205.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$143,749
Leath mheadhanach nan tuarastalan$137,798–$145,205
Ceudail 10mh–90mh$132,950–$155,352

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20255$142,293
FY20261$145,205

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,205–$213,700
Ìre III
Cupertino, CA4 Gearr 202616 Gearr 2026Dearbhaichte
$145,205–$213,700
Ìre III
Cupertino, CA17 Sult 202519 Màrt 2026Dearbhaichte
$165,500–$248,700Cupertino, CA27 Cèit 202525 Samh 2025Dearbhaichte
$142,293–$205,500
Ìre III
Cupertino, CA30 Gibl 202528 Dàmh 2025Dearbhaichte
$136,300–$205,500
Ìre III
Cupertino, CA4 Gearr 202513 Iuch 2025Dearbhaichte
$129,600–$195,200
Ìre III
San Diego, CA29 Samh 202428 Cèit 2025Dearbhaichte

Obraichean eile aig Apple Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).