Dachaigh › Luchd-obrach › Apple Inc. › Finance
Finance aig Apple Inc.: Tuarastalan H-1B
43 iarrtasan cumhaichean-obrach airson an dreuchd Finance aig Apple Inc.. Tuarastal bunasach meadhanach $146,037; leth meadhanach $128,696–$155,840.
Iarrtasan (LCAs)43
Tuarastal meadhanach a chaidh a thabhann$146,037
Leath mheadhanach nan tuarastalan$128,696–$155,840
Ceudail 10mh–90mh$125,790–$162,926
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 21 | $146,037 |
| FY2026 | 22 | $132,138 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $133,943–$207,300 | Cupertino, CA | 25 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $137,900–$207,300 | Cupertino, CA | 21 Cèit 2026 | 25 Cèit 2026 | Dearbhaichte |
| $175,300–$263,100 Ìre IV | Sunnyvale, CA | 20 Cèit 2026 | 4 Samh 2026 | Dearbhaichte |
| $160,425–$207,300 Ìre II | Cupertino, CA | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $133,900–$201,300 Ìre I | Cupertino, CA | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $182,500–$274,800 | Cupertino, CA | 1 Gibl 2026 | 22 Sult 2026 | Dearbhaichte |
| $126,173–$166,100 Ìre II | Cupertino, CA | 17 Màrt 2026 | 16 Sult 2026 | Dearbhaichte |
| $182,500–$274,800 | Cupertino, CA | 17 Màrt 2026 | 8 Sult 2026 | Dearbhaichte |
| $145,407–$207,300 | Cupertino, CA | 5 Màrt 2026 | 18 Lùna 2026 | Dearbhaichte |
| $126,173–$166,100 Ìre II | 10201 N. De Anza Blvd, CA | 27 Gearr 2026 | 28 Lùna 2026 | Dearbhaichte |
| $126,173–$166,100 Ìre II | Sunnyvale, CA | 27 Gearr 2026 | 27 Lùna 2026 | Dearbhaichte |
| $125,694–$166,100 Ìre III | Cupertino, CA | 6 Gearr 2026 | 8 Lùna 2026 | Dearbhaichte |
| $216,000–$324,000 | San Jose, CA | 6 Gearr 2026 | 8 Lùna 2026 | Dearbhaichte |
| $149,622–$207,300 | Cupertino, CA | 4 Gearr 2026 | 16 Gearr 2026 | Dearbhaichte |
| $130,375–$166,100 | Sunnyvale, CA | 4 Gearr 2026 | 6 Lùna 2026 | Dearbhaichte |
| $128,502–$166,100 Ìre III | San Jose, CA | 2 Faoi 2026 | 21 Faoi 2026 | Dearbhaichte |
| $130,375–$166,100 | San Jose, CA | 31 Dùbh 2025 | 21 Faoi 2026 | Dearbhaichte |
| $117,250–$166,100 Ìre III | Cupertino, CA | 23 Samh 2025 | 7 Cèit 2026 | Dearbhaichte |
| $130,375–$166,100 | Cupertino, CA | 7 Samh 2025 | 7 Cèit 2026 | Dearbhaichte |
| $157,442–$207,300 H-1B1 (Singapore) | Cupertino, CA | 8 Lùna 2025 | 1 Gearr 2026 | Dearbhaichte |
| $147,742–$201,300 Ìre IV | Sunnyvale, CA | 9 Iuch 2025 | 7 Faoi 2026 | Dearbhaichte |
| $128,889–$161,300 H-1B1 (Singapore) | Cupertino, CA | 27 Ògmh 2025 | 11 Samh 2025 | Dearbhaichte |
| $128,889–$161,300 H-1B1 (Singapore) | Cupertino, CA | 19 Ògmh 2025 | 18 Dùbh 2025 | Dearbhaichte |
| $162,926–$201,300 Ìre IV | Cupertino, CA | 10 Ògmh 2025 | 16 Samh 2025 | Dearbhaichte |
| $133,900–$201,300 Ìre III | San Jose, CA | 23 Cèit 2025 | 23 Dàmh 2025 | Dearbhaichte |
| $149,895–$201,300 | Cupertino, CA | 14 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $108,909–$161,300 Ìre III | Cupertino, CA | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Cupertino, CA | 21 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| $156,770–$201,300 Ìre IV | Cupertino, CA | 19 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| $162,926–$201,300 Ìre IV | Sunnyvale, CA | 7 Màrt 2025 | 14 Màrt 2025 | Dearbhaichte |
| $91,083–$116,800 Ìre II | Austin, TX | 7 Màrt 2025 | 26 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $162,926–$201,300 Ìre IV | Cupertino, CA | 4 Màrt 2025 | 16 Iuch 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Sunnyvale, CA | 3 Màrt 2025 | 27 Lùna 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Cupertino, CA | 28 Gearr 2025 | 7 Iuch 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Sunnyvale, CA | 2 Gearr 2025 | 12 Gearr 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Cupertino, CA | 26 Faoi 2025 | 7 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $123,864–$161,300 Ìre III | Sunnyvale, CA | 10 Faoi 2025 | 7 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $146,800–$220,900 | Cupertino, CA | 10 Faoi 2025 | 7 Iuch 2025 | Dearbhaichte |
| $146,037–$201,300 Ìre IV | Sunnyvale, CA | 8 Faoi 2025 | 15 Faoi 2025 | Dearbhaichte |
| $126,715–$161,300 | Sunnyvale, CA | 20 Dùbh 2024 | 30 Dùbh 2024 | Dearbhaichte |
| $126,715–$161,300 | San Jose, CA | 16 Dùbh 2024 | 30 Dùbh 2024 | Dearbhaichte |
| $162,926–$201,300 Ìre IV | Cupertino, CA | 30 Dàmh 2024 | 30 Gibl 2025 | Dearbhaichte |
| $154,909–$201,300 | Sunnyvale, CA | 17 Dàmh 2024 | 16 Gibl 2025 | Dearbhaichte |
Finance aig gach neach-fastaidh →
Obraichean eile aig Apple Inc.
- Software Engineering Applications$181,100
- Software Development Engineering$186,142
- Software Development Engineer$186,000
- Software Engineering Systems$177,154
- Software Development Engineer - Applications$182,312
- Software Development Engineer - Test$174,157
- Machine Learning$190,486
- Machine Learning Engineer$187,737
- Software Development Engineer - Systems$179,000
- Engineering Project/Program$166,962
- Tools and Automation Engineer$163,300
- Software Development Engineer - Firmware$177,154
- Physical Design Engineer$160,553
- Data Scientist$170,373
- Design Verification$161,179
- Design Verification Engineer$157,326
- Software Developer$155,397
- Engineering Project Manager$169,100
- Module Design Engineer$158,995
- Tools & Automation Engineer$164,050
- Strategic Sourcing Manager$151,200
- FE Engineering$171,138
- Hardware Systems Engineering$174,304
- Electronics Engineer$147,553
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).