Dachaigh › Luchd-obrach › Apple Inc. › Manufacturing Quality
Manufacturing Quality aig Apple Inc.: Tuarastalan H-1B
58 iarrtasan cumhaichean-obrach airson an dreuchd Manufacturing Quality aig Apple Inc.. Tuarastal bunasach meadhanach $166,962; leth meadhanach $143,021–$170,248.
Iarrtasan (LCAs)58
Tuarastal meadhanach a chaidh a thabhann$166,962
Leath mheadhanach nan tuarastalan$143,021–$170,248
Ceudail 10mh–90mh$142,293–$170,248
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 33 | $166,962 |
| FY2026 | 25 | $166,962 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $170,248–$236,700 Ìre IV | Cupertino, CA | 10 Ògmh 2026 | 10 Dùbh 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 1 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $150,000–$160,000 Ìre II | Cupertino, CA | 6 Cèit 2026 | 6 Cèit 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 20 Gibl 2026 | 4 Cèit 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Sunnyvale, CA | 17 Gibl 2026 | 16 Dàmh 2026 | Dearbhaichte |
| $132,142–$193,800 Ìre II | Cupertino, CA | 7 Gibl 2026 | 7 Dàmh 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 24 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Sunnyvale, CA | 19 Màrt 2026 | 18 Sult 2026 | Dearbhaichte |
| $128,400–$193,800 Ìre II | Cupertino, CA | 27 Gearr 2026 | 28 Lùna 2026 | Dearbhaichte |
| $132,051–$193,800 | Sunnyvale, CA | 23 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| $145,205–$193,800 Ìre III | Cupertino, CA | 20 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 15 Faoi 2026 | 17 Iuch 2026 | Dearbhaichte |
| $170,428–$236,700 Ìre IV | Cupertino, CA | 7 Faoi 2026 | 19 Faoi 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 24 Dùbh 2025 | 5 Gibl 2026 | Dearbhaichte |
| $157,237–$236,700 | Cupertino, CA | 11 Dùbh 2025 | 22 Gearr 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 21 Samh 2025 | 24 Samh 2025 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Sunnyvale, CA | 18 Samh 2025 | 20 Cèit 2026 | Dearbhaichte |
| $145,205–$193,800 Ìre III | Cupertino, CA | 18 Samh 2025 | 20 Cèit 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 17 Samh 2025 | 19 Cèit 2026 | Dearbhaichte |
| $145,205–$193,800 Ìre III | Cupertino, CA | 29 Sult 2025 | 6 Dàmh 2025 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 15 Sult 2025 | 11 Màrt 2026 | Dearbhaichte |
| $196,200–$295,000 Ìre II | Sunnyvale, CA | 8 Sult 2025 | 27 Sult 2025 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 5 Sult 2025 | 6 Màrt 2026 | Dearbhaichte |
| $145,205–$193,800 Ìre III | Cupertino, CA | 12 Lùna 2025 | 11 Gearr 2026 | Dearbhaichte |
| $145,205–$193,800 Ìre III | Cupertino, CA | 6 Lùna 2025 | 3 Gearr 2026 | Dearbhaichte |
| $170,248–$236,700 Ìre IV | Cupertino, CA | 30 Iuch 2025 | 24 Faoi 2026 | Dearbhaichte |
| $145,205–$184,600 Ìre III | Cupertino, CA | 3 Iuch 2025 | 1 Faoi 2026 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 17 Ògmh 2025 | 13 Dùbh 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 3 Ògmh 2025 | 15 Samh 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 19 Cèit 2025 | 6 Samh 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 12 Cèit 2025 | 19 Cèit 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 9 Cèit 2025 | 30 Dàmh 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 21 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,200–$227,600 | Cupertino, CA | 8 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $152,808–$227,600 | Cupertino, CA | 7 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $167,563–$227,600 Ìre IV | Cupertino, CA | 24 Màrt 2025 | 19 Sult 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 22 Màrt 2025 | 21 Sult 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 18 Màrt 2025 | 3 Sult 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 10 Màrt 2025 | 3 Lùna 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $142,293–$184,600 Ìre III | Cupertino, CA | 10 Màrt 2025 | 22 Lùna 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $142,293–$184,600 Ìre III | Cupertino, CA | 7 Màrt 2025 | 22 Lùna 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $142,293–$184,600 Ìre III | Cupertino, CA | 7 Màrt 2025 | 22 Lùna 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 6 Màrt 2025 | 22 Lùna 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $142,293–$184,600 Ìre III | Cupertino, CA | 4 Màrt 2025 | 20 Lùna 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 28 Gearr 2025 | 20 Lùna 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 25 Gearr 2025 | 11 Cèit 2025 | Dearbhaichte |
| $155,043–$184,600 Ìre III | Cupertino, CA | 28 Faoi 2025 | 17 Ògmh 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 26 Dùbh 2024 | 25 Ògmh 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 20 Dùbh 2024 | 6 Faoi 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 20 Dùbh 2024 | 30 Dùbh 2024 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 17 Dùbh 2024 | 30 Dùbh 2024 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Sunnyvale, CA | 13 Dùbh 2024 | 23 Dùbh 2024 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Sunnyvale, CA | 15 Samh 2024 | 11 Màrt 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Cupertino, CA | 6 Samh 2024 | 6 Cèit 2025 | Dearbhaichte |
| $166,962–$227,600 Ìre IV | Cupertino, CA | 30 Dàmh 2024 | 30 Gibl 2025 | Dearbhaichte |
| $142,293–$184,600 Ìre III | Sunnyvale, CA | 22 Dàmh 2024 | 18 Gibl 2025 | Dearbhaichte |
| $164,793–$227,600 | Cupertino, CA | 8 Dàmh 2024 | 6 Gibl 2025 | Dearbhaichte |
Manufacturing Quality aig gach neach-fastaidh →
Obraichean eile aig Apple Inc.
- Software Engineering Applications$181,100
- Software Development Engineering$186,142
- Software Development Engineer$186,000
- Software Engineering Systems$177,154
- Software Development Engineer - Applications$182,312
- Software Development Engineer - Test$174,157
- Machine Learning$190,486
- Machine Learning Engineer$187,737
- Software Development Engineer - Systems$179,000
- Engineering Project/Program$166,962
- Tools and Automation Engineer$163,300
- Software Development Engineer - Firmware$177,154
- Physical Design Engineer$160,553
- Data Scientist$170,373
- Design Verification$161,179
- Design Verification Engineer$157,326
- Software Developer$155,397
- Engineering Project Manager$169,100
- Module Design Engineer$158,995
- Tools & Automation Engineer$164,050
- Strategic Sourcing Manager$151,200
- FE Engineering$171,138
- Hardware Systems Engineering$174,304
- Electronics Engineer$147,553
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).