Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Apple Inc. › Module Systems Manager

Module Systems Manager aig Apple Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Module Systems Manager aig Apple Inc.. Tuarastal bunasach meadhanach $211,094; leth meadhanach $191,641–$218,000.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$211,094
Leath mheadhanach nan tuarastalan$191,641–$218,000
Ceudail 10mh–90mh$189,250–$252,235

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$213,124
FY20242$201,276

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$189,612–$275,600Cupertino, CA17 Faoi 20245 Ògmh 2024Dearbhaichte
$212,939–$260,000Cupertino, CA9 Samh 20239 Cèit 2024Dearbhaichte
$192,317–$260,000
Ìre II
Cupertino, CA14 Màrt 202327 Màrt 2023Dearbhaichte
$188,406–$260,000
Ìre II
Cupertino, CA16 Gearr 202316 Gearr 2023Dearbhaichte
$217,000
Ìre III
Cupertino, CA27 Faoi 202314 Ògmh 2023Dearbhaichte
$221,000
Ìre II
Cupertino, CA9 Faoi 202316 Faoi 2023Dearbhaichte
$325,116
Ìre III
Cupertino, CA19 Dàmh 202220 Gibl 2023Dearbhaichte
$209,248
Ìre II
Cupertino, CA11 Dàmh 202225 Dàmh 2022Dearbhaichte

Obraichean eile aig Apple Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).