Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Apple Inc. › Operations Engineer Project Manager

Operations Engineer Project Manager aig Apple Inc.: Tuarastalan H-1B

20 iarrtasan cumhaichean-obrach airson an dreuchd Operations Engineer Project Manager aig Apple Inc.. Tuarastal bunasach meadhanach $170,248; leth meadhanach $144,477–$175,775.

Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$170,248
Leath mheadhanach nan tuarastalan$144,477–$175,775
Ceudail 10mh–90mh$141,949–$190,500

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20245$166,962
FY20257$166,962
FY20268$170,248

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$185,318–$236,700Sunnyvale, CA18 Cèit 202613 Samh 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Sunnyvale, CA20 Gibl 202620 Dàmh 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Sunnyvale, CA25 Màrt 202624 Sult 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Cupertino, CA10 Dùbh 202511 Ògmh 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Sunnyvale, CA4 Dùbh 20258 Dùbh 2025Dearbhaichte
$196,200–$295,000
Ìre II
Cupertino, CA14 Samh 202520 Samh 2025Dearbhaichte
$170,248–$213,700
Ìre IV
Sunnyvale, CA18 Sult 202529 Sult 2025Dearbhaichte
$145,205–$193,800
Ìre III
Cupertino, CA24 Iuch 20254 Lùna 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA2 Cèit 202512 Cèit 2025Dearbhaichte
$178,400–$268,500
Ìre IV
Cupertino, CA2 Gibl 202526 Sult 2025Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA25 Màrt 202526 Màrt 2025Dearbhaichte
$117,645–$144,227
Ìre II
Sunnyvale, CA5 Màrt 202516 Iuch 2025Dearbhaichte
$142,293–$184,600
Ìre III
Sunnyvale, CA30 Faoi 202526 Iuch 2025Dearbhaichte, an uair sin air a tharraing air ais
$138,857–$184,600Cupertino, CA4 Dàmh 202426 Màrt 2025Dearbhaichte, an uair sin air a tharraing air ais
$190,500–$286,400
Ìre II
Cupertino, CA27 Sult 202415 Màrt 2025Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA19 Sult 202419 Màrt 2025Dearbhaichte
$190,500–$286,400
Ìre II
Cupertino, CA14 Sult 202431 Faoi 2025Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA12 Sult 202412 Màrt 2025Dearbhaichte
$166,962–$223,100
Ìre IV
Cupertino, CA1 Lùna 202429 Faoi 2025Dearbhaichte
$174,900–$263,200
Ìre IV
Cupertino, CA1 Gibl 202415 Gibl 2024Dearbhaichte

Obraichean eile aig Apple Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).