Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Apple Inc. › Operations Engineering Project Manager

Operations Engineering Project Manager aig Apple Inc.: Tuarastalan H-1B

37 iarrtasan cumhaichean-obrach airson an dreuchd Operations Engineering Project Manager aig Apple Inc.. Tuarastal bunasach meadhanach $166,962; leth meadhanach $162,200–$178,400.

Iarrtasan (LCAs)37
Tuarastal meadhanach a chaidh a thabhann$166,962
Leath mheadhanach nan tuarastalan$162,200–$178,400
Ceudail 10mh–90mh$142,293–$192,780

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20244$157,581
FY202523$166,962
FY202610$170,248

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$216,091–$295,000
Ìre IV
Cupertino, CA8 Ògmh 202626 Sult 2026Dearbhaichte
$167,501–$236,700Cupertino, CA11 Cèit 202615 Cèit 2026Dearbhaichte
$216,091–$236,700
Ìre IV
Cupertino, CA4 Cèit 202622 Iuch 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Sunnyvale, CA1 Gibl 202625 Lùna 2026Dearbhaichte
$128,400–$193,800
Ìre II
Cupertino, CA23 Gearr 202623 Gearr 2026Dearbhaichte
$196,200–$295,000
Ìre II
Cupertino, CA20 Faoi 202622 Iuch 2026Dearbhaichte
$196,200–$295,000
Ìre II
Cupertino, CA12 Samh 202513 Cèit 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Cupertino, CA5 Samh 20256 Cèit 2026Dearbhaichte
$170,248–$236,700
Ìre IV
Cupertino, CA12 Sult 202510 Màrt 2026Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA17 Ògmh 202513 Dùbh 2025Dearbhaichte
$190,500–$286,400
Ìre II
Cupertino, CA3 Ògmh 202514 Samh 2025Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA22 Cèit 20251 Dàmh 2025Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA15 Cèit 20251 Dàmh 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA5 Cèit 202519 Cèit 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA23 Gibl 20251 Dàmh 2025Dearbhaichte
$178,400–$268,500
Ìre IV
Cupertino, CA26 Màrt 20251 Sult 2025Dearbhaichte
$178,400–$268,500
Ìre IV
Cupertino, CA24 Màrt 20251 Cèit 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA20 Màrt 202510 Sult 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Sunnyvale, CA11 Màrt 20253 Lùna 2025Dearbhaichte, an uair sin air a tharraing air ais
$142,293–$184,600
Ìre III
Cupertino, CA10 Màrt 20253 Lùna 2025Dearbhaichte, an uair sin air a tharraing air ais
$142,293–$184,600
Ìre III
Cupertino, CA10 Màrt 202522 Lùna 2025Dearbhaichte
$190,500–$286,400
Ìre II
Sunnyvale, CA6 Màrt 202514 Lùna 2025Dearbhaichte
$162,200–$243,300
Ìre II
Sunnyvale, CA21 Gearr 20253 Màrt 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA19 Gearr 202517 Iuch 2025Dearbhaichte
$178,400–$268,500
Ìre IV
Cupertino, CA17 Gearr 20252 Lùna 2025Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA18 Dùbh 202417 Ògmh 2025Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA16 Dùbh 202430 Dùbh 2024Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA12 Dùbh 202423 Dùbh 2024Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA26 Samh 202428 Samh 2024Dearbhaichte
$178,400–$268,500
Ìre IV
Cupertino, CA6 Samh 202422 Gibl 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Cupertino, CA6 Samh 20246 Cèit 2025Dearbhaichte
$162,200–$243,300
Ìre II
Cupertino, CA7 Dàmh 20246 Gearr 2025Dearbhaichte
$190,500–$286,400
Ìre II
Cupertino, CA4 Dàmh 202427 Gearr 2025Dearbhaichte
$142,293–$184,600
Ìre III
Cupertino, CA14 Sult 202420 Gearr 2025Dearbhaichte
$166,962–$227,600
Ìre IV
Sunnyvale, CA19 Lùna 20242 Sult 2024Dearbhaichte
$148,200–$223,100
Ìre IV
Sunnyvale, CA21 Cèit 202410 Samh 2024Dearbhaichte
$174,900–$263,200
Ìre IV
Sunnyvale, CA15 Màrt 20241 Sult 2024Dearbhaichte

Obraichean eile aig Apple Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).