Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Business Unit Operations Analyst

Business Unit Operations Analyst aig Applied Materials, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Business Unit Operations Analyst aig Applied Materials, Inc. Tuarastal bunasach meadhanach $153,808; leth meadhanach $135,711–$170,062.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$153,808
Leath mheadhanach nan tuarastalan$135,711–$170,062
Ceudail 10mh–90mh$132,284–$170,174

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$130,000
FY20251$137,615
FY20262$170,124

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$170,000–$190,000Santa Clara, CA16 Màrt 202630 Màrt 2026Dearbhaichte
$170,248–$190,248
Ìre IV
Santa Clara, CA30 Sult 20251 Gibl 2026Dearbhaichte
$170,248–$190,248
Ìre IV
Santa Clara, CA30 Sult 202513 Dàmh 2025Air a tharraing air ais
$137,615–$157,615
Ìre IV
Cypress, TX19 Cèit 20257 Samh 2025Dearbhaichte
$130,000–$150,000
Ìre III
Cypress, TX26 Dàmh 20227 Samh 2022Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).