Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Manager, Electrical Engineer

Manager, Electrical Engineer aig Applied Materials, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Electrical Engineer aig Applied Materials, Inc. Tuarastal bunasach meadhanach $186,363; leth meadhanach $180,000–$191,518.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$186,363
Leath mheadhanach nan tuarastalan$180,000–$191,518
Ceudail 10mh–90mh$179,291–$192,328

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$180,000
FY20241$186,363
FY20252$185,843
FY20261$191,518

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$191,518–$211,518
Ìre I
Santa Clara, CA24 Sult 202525 Màrt 2026Dearbhaichte
$178,818–$198,818
Ìre I
Santa Clara, CA21 Iuch 202528 Iuch 2025Dearbhaichte
$192,868–$212,868
Ìre I
Santa Clara, CA1 Gibl 20251 Gibl 2025Dearbhaichte
$186,363–$216,363Santa Clara, CA16 Faoi 20245 Iuch 2024Dearbhaichte
$180,000–$200,000Santa Clara, CA22 Màrt 20233 Gibl 2023Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).