Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Manager, Technical Project/Program Management

Manager, Technical Project/Program Management aig Applied Materials, Inc: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Technical Project/Program Management aig Applied Materials, Inc. Tuarastal bunasach meadhanach $181,566; leth meadhanach $168,000–$208,125.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$181,566
Leath mheadhanach nan tuarastalan$168,000–$208,125
Ceudail 10mh–90mh$164,344–$216,091

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$168,000
FY20242$194,846
FY20252$182,481
FY20262$216,091

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$216,091–$236,091
Ìre IV
Santa Clara, CA5 Cèit 20261 Dàmh 2026Dearbhaichte
$216,091–$236,091
Ìre IV
Santa Clara, CA23 Gibl 20264 Cèit 2026Dearbhaichte
$166,962–$186,962Santa Clara, CA14 Iuch 202528 Iuch 2025Dearbhaichte
$198,000–$218,000
Ìre I
Santa Clara, CA13 Ògmh 202523 Ògmh 2025Dearbhaichte
$208,125–$228,125
Ìre II
Santa Clara, CA9 Lùna 202424 Faoi 2025Dearbhaichte
$181,566–$201,566
Ìre III
Santa Clara, CA7 Samh 202329 Màrt 2024Dearbhaichte
$179,055–$199,055
Ìre III
Santa Clara, CA16 Ògmh 202326 Ògmh 2023Dearbhaichte
$168,000–$188,000
Ìre II
Austin, TX13 Ògmh 202326 Ògmh 2023Dearbhaichte
$153,871–$173,871Austin, TX18 Dàmh 202228 Samh 2022Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).