Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Materials Project Management Engineer

Materials Project Management Engineer aig Applied Materials, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Materials Project Management Engineer aig Applied Materials, Inc. Tuarastal bunasach meadhanach $145,000; leth meadhanach $132,476–$167,723.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$145,000
Leath mheadhanach nan tuarastalan$132,476–$167,723
Ceudail 10mh–90mh$116,517–$167,769

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20254$156,362
FY20261$132,476

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$132,476–$152,476Austin, TX13 Cèit 20261 Dàmh 2026Dearbhaichte
$167,723–$187,723
Ìre IV
Santa Clara, CA5 Màrt 20256 Ògmh 2025Dearbhaichte
$167,800–$187,800
Ìre IV
Santa Clara, CA20 Gearr 20253 Màrt 2025Dearbhaichte
$145,000–$165,000Santa Clara, CA13 Dùbh 202416 Dùbh 2024Dearbhaichte
$105,878–$125,878
Ìre III
Austin, TX15 Samh 20242 Cèit 2025Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).