Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Non-Technical Project/Program Management Analyst

Non-Technical Project/Program Management Analyst aig Applied Materials, Inc: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Non-Technical Project/Program Management Analyst aig Applied Materials, Inc. Tuarastal bunasach meadhanach $133,266; leth meadhanach $97,210–$145,000.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$133,266
Leath mheadhanach nan tuarastalan$97,210–$145,000
Ceudail 10mh–90mh$94,340–$176,963

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$168,567
FY20254$115,154
FY20263$133,266

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$133,266–$153,266
Ìre III
Santa Clara, CA15 Cèit 20261 Dàmh 2026Dearbhaichte
$84,302–$104,302
Ìre II
Austin, TX6 Cèit 20261 Dàmh 2026Dearbhaichte
$170,670–$190,670
Ìre IV
Santa Clara, CA9 Gearr 202619 Ògmh 2026Dearbhaichte
$133,099–$153,099
Ìre IV
Missouri City, TX7 Cèit 202512 Sult 2025Dearbhaichte
$96,850–$116,850
Ìre III
Austin, TX10 Gibl 20251 Dàmh 2025Dearbhaichte
$97,210–$117,210
Ìre III
Austin, TX25 Màrt 202526 Màrt 2025Dearbhaichte
$145,000–$165,000
Ìre IV
Austin, TX21 Samh 20242 Dùbh 2024Dearbhaichte
$202,134–$222,134Santa Clara, CA11 Gibl 202423 Lùna 2024Dearbhaichte
$135,000–$155,000
Ìre III
Santa Clara, CA5 Màrt 202418 Màrt 2024Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).