Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Applied Materials, Inc › Non-Technical Project/Program Management Engineer

Non-Technical Project/Program Management Engineer aig Applied Materials, Inc: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Non-Technical Project/Program Management Engineer aig Applied Materials, Inc. Tuarastal bunasach meadhanach $108,851; leth meadhanach $101,649–$127,332.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$108,851
Leath mheadhanach nan tuarastalan$101,649–$127,332
Ceudail 10mh–90mh$93,500–$140,408

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$126,000
FY20243$107,702
FY20254$112,414

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$161,596–$181,596Santa Clara, CA10 Gibl 20251 Dàmh 2025Dearbhaichte
$131,328–$151,328Santa Clara, CA17 Dùbh 202431 Cèit 2025Dearbhaichte
$93,500–$113,500
Ìre II
Austin, TX11 Dùbh 202417 Dùbh 2024Dearbhaichte
$93,500–$113,500
Ìre II
Austin, TX21 Samh 202423 Cèit 2025Dearbhaichte
$104,365–$124,365Santa Clara, CA8 Gearr 20248 Gearr 2024Dearbhaichte
$107,702–$127,702
Ìre II
Santa Clara, CA8 Gearr 20248 Gearr 2024Dearbhaichte
$110,000–$130,000
Ìre II
Santa Clara, CA7 Gearr 20247 Gearr 2024Dearbhaichte
$126,000–$146,000
Ìre III
Santa Clara, CA31 Iuch 202318 Faoi 2024Dearbhaichte

Obraichean eile aig Applied Materials, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).