Dachaigh › Luchd-obrach › APSI Construction Management
APSI Construction Management: Tuarastalan H-1B agus taic bhìosa
Chuir APSI Construction Management 16 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $115,000.
A bheil APSI Construction Management a’ toirt taic do bhìosaichean H-1B?
Chuir APSI Construction Management 16 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 6 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Scheduler | 3 | $115,000 |
| Cost Controller II | 3 | $135,000 |
| Project Controls Engineer | 2 | $102,700 |
| Scheduling Manager | 2 | $170,000 |
| Cost Estimator II | 1 | — |
| Project Engineer | 1 | $85,000 |
| Scheduler I | 1 | $85,000 |
| Cost Control Manager | 1 | $159,000 |
| Cost Controller III | 1 | $150,000 |
| Construction Manager | 1 | $110,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $115,000 |
| FY2024 | 4 | $85,000 |
| FY2025 | 5 | $154,500 |
| FY2026 | 3 | $135,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Cost Controller II | $135,000 Ìre III | Torrance, CA | 6 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Cost Controller II | $180,274 Ìre IV | Torrance, CA | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Construction Manager | $110,000 Ìre II | Patton, CA | 24 Samh 2025 | 8 Dùbh 2025 | Dearbhaichte |
| Cost Controller III | $150,000 Ìre III | Irvine, CA | 22 Sult 2025 | 6 Dàmh 2025 | Dearbhaichte |
| Scheduling Manager | $170,000 Ìre IV | Irvine, CA | 7 Gibl 2025 | 21 Gibl 2025 | Air a tharraing air ais |
| Scheduling Manager | $170,000 Ìre IV | Irvine, CA | 1 Gibl 2025 | 14 Gibl 2025 | Dearbhaichte |
| Cost Control Manager | $159,000 Ìre IV | Irvine, CA | 28 Màrt 2025 | 14 Gibl 2025 | Dearbhaichte |
| Project Controls Engineer | $115,000 Ìre II | Torrance, CA | 28 Màrt 2025 | 6 Sult 2025 | Dearbhaichte |
| Scheduler | $82,014 Ìre I | Torrance, CA | 1 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $85,000 Ìre I | Torrance, CA | 17 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Scheduler I | $85,000 Ìre I | Torrance, CA | 16 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Controls Engineer | $90,400 Ìre I | Irvine, CA | 6 Màrt 2024 | 1 Gibl 2024 | Dearbhaichte |
| Cost Controller II | $127,000 Ìre III | Irvine, CA | 9 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Cost Estimator II | $127,000 Ìre IV | Irvine, CA | 9 Lùna 2023 | 1 Dàmh 2023 | Air a tharraing air ais |
| Scheduler | $115,000 Ìre II | Irvine, CA | 16 Dùbh 2022 | 19 Dùbh 2022 | Dearbhaichte |
| Scheduler | $115,000 Ìre II | Irvine, CA | 16 Dùbh 2022 | 19 Dùbh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).