Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Ares Operations, LLC › Managing Director, Head of Construction, Self-Storage

Managing Director, Head of Construction, Self-Storage aig Ares Operations, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Managing Director, Head of Construction, Self-Storage aig Ares Operations, LLC. Tuarastal bunasach meadhanach $115,877; leth meadhanach $115,877–$115,877.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$115,877
Leath mheadhanach nan tuarastalan$115,877–$115,877
Ceudail 10mh–90mh$115,877–$128,981

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$115,877

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$137,717–$525,000
Ìre IV
Redondo Beach, CA17 Gibl 20264 Cèit 2026Dearbhaichte
$115,877–$525,000
E-3 · Ìre III
Redondo Beach, CA13 Faoi 202613 Faoi 2026Dearbhaichte
$115,877–$525,000
E-3 · Ìre III
Redondo Beach, CA19 Samh 20251 Dùbh 2025Dearbhaichte
$115,877–$525,000
Ìre III
Redondo Beach, CA19 Samh 20251 Faoi 2026Dearbhaichte
$115,877–$525,000
Ìre III
Redondo Beach, CA19 Samh 20251 Faoi 2026Dearbhaichte

Obraichean eile aig Ares Operations, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).