Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Arista Networks, Inc. › POC Engineer

POC Engineer aig Arista Networks, Inc.: Tuarastalan H-1B

13 iarrtasan cumhaichean-obrach airson an dreuchd POC Engineer aig Arista Networks, Inc.. Tuarastal bunasach meadhanach $123,117; leth meadhanach $120,497–$145,259.

Iarrtasan (LCAs)13
Tuarastal meadhanach a chaidh a thabhann$123,117
Leath mheadhanach nan tuarastalan$120,497–$145,259
Ceudail 10mh–90mh$115,446–$148,533

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$145,745
FY20243$115,446
FY20253$120,497
FY20263$123,117

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$123,117–$148,495Santa Clara, CA26 Faoi 202627 Faoi 2026Dearbhaichte
$123,117–$148,495Santa Clara, CA15 Faoi 202627 Faoi 2026Dearbhaichte
$123,117–$148,495Santa Clara, CA14 Faoi 202627 Faoi 2026Dearbhaichte
$149,108–$175,957Santa Clara, CA12 Lùna 20257 Gearr 2026Dearbhaichte
$120,497–$149,107Santa Clara, CA27 Ògmh 202511 Dàmh 2025Dearbhaichte
$120,497–$149,107Santa Clara, CA21 Cèit 20251 Sult 2025Dearbhaichte
$142,971–$161,303Ledgewood, NJ26 Màrt 20241 Cèit 2024Dearbhaichte
$115,446–$135,556Cary, NC5 Gearr 20248 Gearr 2024Dearbhaichte
$115,446–$135,556Cary, NC26 Faoi 20248 Gearr 2024Dearbhaichte
$146,231–$166,708Santa Clara, CA28 Lùna 20231 Gearr 2024Dearbhaichte
$145,259–$165,800Santa Clara, CA12 Cèit 202312 Dàmh 2023Dearbhaichte
$160,422–$180,631Santa Clara, CA24 Faoi 20237 Gearr 2023Dearbhaichte
$114,671–$139,227Santa Clara, CA27 Sult 202211 Dàmh 2022Dearbhaichte

Obraichean eile aig Arista Networks, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).