Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asml US, LP › Design Engineering and Architecture Line Manager 1

Design Engineering and Architecture Line Manager 1 aig Asml US, LP: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineering and Architecture Line Manager 1 aig Asml US, LP. Tuarastal bunasach meadhanach $154,066; leth meadhanach $150,675–$158,950.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$154,066
Leath mheadhanach nan tuarastalan$150,675–$158,950
Ceudail 10mh–90mh$140,850–$160,462

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$154,066
FY20242$156,072

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$161,470–$217,350
Ìre II
Wilton, CT13 Sult 202420 Sult 2024Dearbhaichte
$150,675–$217,350
Ìre II
Wilton, CT5 Ògmh 202412 Ògmh 2024Dearbhaichte
$158,950–$215,050
Ìre II
Wilton, CT24 Lùna 20231 Dàmh 2023Dearbhaichte
$134,300–$181,700
Ìre II
Wilton, CT23 Dùbh 20224 Faoi 2023Dearbhaichte
$154,066–$197,500
Ìre II
Wilton, CT21 Samh 20222 Dùbh 2022Dearbhaichte

Obraichean eile aig Asml US, LP

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).