Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asml US, LP › Mechatronics Architect 3

Mechatronics Architect 3 aig Asml US, LP: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Mechatronics Architect 3 aig Asml US, LP. Tuarastal bunasach meadhanach $149,175; leth meadhanach $135,812–$156,825.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$149,175
Leath mheadhanach nan tuarastalan$135,812–$156,825
Ceudail 10mh–90mh$133,500–$164,475

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$138,125
FY20256$156,825
FY20264$133,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$133,500–$222,500
Ìre III
Wilton, CT9 Gearr 20264 Lùna 2026Dearbhaichte
$133,500–$222,500
Ìre III
Wilton, CT30 Faoi 202610 Gearr 2026Dearbhaichte
$129,750–$222,500
Ìre III
Wilton, CT20 Faoi 202618 Iuch 2026Dearbhaichte, an uair sin air a tharraing air ais
$147,375–$245,625
Ìre II
San Jose, CA26 Sult 202520 Dàmh 2025Dearbhaichte
$164,475–$222,525
Ìre III
San Jose, CA9 Iuch 202519 Lùna 2025Dearbhaichte
$164,475–$222,525
Ìre II
San Jose, CA7 Cèit 20254 Sult 2025Dearbhaichte
$149,175–$201,825
Ìre II
San Jose, CA29 Gibl 202520 Dàmh 2025Dearbhaichte
$149,175–$201,825
Ìre II
Wilton, CT9 Gibl 20251 Dàmh 2025Dearbhaichte
$149,175–$201,825
Ìre II
Wilton, CT17 Faoi 202511 Iuch 2025Dearbhaichte
$164,475–$222,525
Ìre II
San Jose, CA20 Dùbh 202419 Ògmh 2025Dearbhaichte
$138,125–$186,875
Ìre II
Wilton, CT18 Màrt 202413 Sult 2024Dearbhaichte

Obraichean eile aig Asml US, LP

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).