Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asml US, LP › Upgrade Install and Relocation Engineer 2

Upgrade Install and Relocation Engineer 2 aig Asml US, LP: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Upgrade Install and Relocation Engineer 2 aig Asml US, LP. Tuarastal bunasach meadhanach $75,733; leth meadhanach $75,733–$79,394.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$75,733
Leath mheadhanach nan tuarastalan$75,733–$79,394
Ceudail 10mh–90mh$71,616–$81,520

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20246$75,733
FY20251$80,053

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$80,053–$86,825Hillsboro, OR20 Cèit 20251 Dàmh 2025Dearbhaichte
$75,733–$86,825
Ìre I
Hillsboro, OR14 Ògmh 20241 Dàmh 2024Dearbhaichte
$83,720–$86,825
Ìre II
Chandler, AZ12 Ògmh 20241 Dàmh 2024Dearbhaichte
$75,733–$86,825
Ìre I
Hillsboro, OR6 Ògmh 20241 Dàmh 2024Dearbhaichte
$78,734–$86,825Austin, TX4 Ògmh 20241 Dàmh 2024Dearbhaichte
$65,441–$86,825Austin, TX21 Cèit 20241 Dàmh 2024Dearbhaichte
$75,733–$86,825
Ìre I
Hillsboro, OR9 Cèit 20241 Dàmh 2024Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Asml US, LP

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).