Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Astir IT Solutions, Inc › Technical Consultant

Technical Consultant aig Astir IT Solutions, Inc: Tuarastalan H-1B

32 iarrtasan cumhaichean-obrach airson an dreuchd Technical Consultant aig Astir IT Solutions, Inc. Tuarastal bunasach meadhanach $100,000; leth meadhanach $87,125–$107,375.

Iarrtasan (LCAs)32
Tuarastal meadhanach a chaidh a thabhann$100,000
Leath mheadhanach nan tuarastalan$87,125–$107,375
Ceudail 10mh–90mh$70,000–$122,900

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$98,750
FY20246$79,000
FY202510$101,000
FY202610$107,750

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$108,500
Ìre II
Bolingbrook, IL23 Ògmh 202616 Dùbh 2026Dearbhaichte
$112,000
Ìre II
Monroe, WA22 Ògmh 202622 Dùbh 2026Dearbhaichte
$113,000
Ìre II
Allen, TX28 Cèit 20264 Ògmh 2026Dearbhaichte
$113,000
Ìre II
Allen, TX28 Cèit 20264 Ògmh 2026Dearbhaichte
$139,500
Ìre II
San Jose, CA24 Màrt 202631 Màrt 2026Dearbhaichte
$70,000
Ìre II
Bentonville, AR3 Dùbh 202510 Dùbh 2025Dearbhaichte
$99,000
Ìre II
Parsippany, NJ10 Samh 20252 Cèit 2026Dearbhaichte
$107,000
Ìre III
Dearborn, MI31 Dàmh 20257 Samh 2025Dearbhaichte
$102,500
Ìre II
Dearborn, MI31 Dàmh 20257 Samh 2025Dearbhaichte
$84,500
Ìre II
Dearborn, MI31 Dàmh 20257 Samh 2025Dearbhaichte
$70,000
Ìre II
Bentonville, AR19 Ògmh 202515 Dùbh 2025Dearbhaichte
$100,000
Ìre II
Charlotte, NC15 Cèit 202522 Cèit 2025Dearbhaichte
$70,000
Ìre II
Bentonville, AR28 Gibl 20255 Cèit 2025Dearbhaichte
$99,000
Ìre II
Lansing, MI20 Màrt 202527 Màrt 2025Dearbhaichte
$99,000
Ìre II
Parsippany, NJ7 Màrt 202514 Màrt 2025Dearbhaichte
$125,500
Ìre III
Miramar, FL26 Dùbh 202416 Ògmh 2025Dearbhaichte
$124,000
Ìre II
Brooklyn, NY28 Dàmh 20244 Samh 2024Dearbhaichte, an uair sin air a tharraing air ais
$107,000
Ìre II
Bolingbrook, IL4 Dàmh 202411 Dàmh 2024Dearbhaichte
$124,000
Ìre II
Plainsboro, NJ30 Sult 202411 Gearr 2025Dearbhaichte
$99,000
Ìre II
Parsippany, NJ2 Lùna 20249 Lùna 2024Dearbhaichte
$100,000
Ìre II
Lakeville, MN24 Ògmh 20241 Iuch 2024Dearbhaichte
$70,000
Ìre I
South Plainfield, NJ10 Ògmh 20241 Dàmh 2024Dearbhaichte
$70,000
Ìre I
South Plainfield, NJ29 Cèit 20241 Dàmh 2024Dearbhaichte
$70,000
Ìre II
Bentonville, AR20 Cèit 202427 Cèit 2024Dearbhaichte
$88,000
Ìre II
Richmond, VA17 Dàmh 20237 Gibl 2024Dearbhaichte
$102,000
Ìre II
Bentonville, AR28 Ògmh 20235 Iuch 2023Dearbhaichte, an uair sin air a tharraing air ais
$102,000
Ìre II
Seattle, WA28 Ògmh 20235 Iuch 2023Dearbhaichte
$96,500
Ìre II
Webster, NY23 Ògmh 20231 Dàmh 2023Dearbhaichte
$76,000
Ìre II
Austin, TX12 Gibl 20231 Dàmh 2023Dearbhaichte
$101,000
Ìre II
Fremont, CA10 Gearr 202317 Gearr 2023Dearbhaichte
$102,000
Ìre II
Tysons, VA8 Dùbh 202215 Dùbh 2022Dearbhaichte
$96,000
Ìre II
King of Prussia, PA28 Sult 20225 Màrt 2023Dearbhaichte

Technical Consultant aig gach neach-fastaidh →

Obraichean eile aig Astir IT Solutions, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).