Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Asurion, LLC › SQA Engineer 4

SQA Engineer 4 aig Asurion, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd SQA Engineer 4 aig Asurion, LLC. Tuarastal bunasach meadhanach $153,931; leth meadhanach $140,000–$160,014.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$153,931
Leath mheadhanach nan tuarastalan$140,000–$160,014
Ceudail 10mh–90mh$136,103–$163,886

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$153,234
FY20253$153,931

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$133,505
Ìre IV
Nashville, TN17 Gearr 202519 Lùna 2025Dearbhaichte
$153,931Sterling, VA28 Dàmh 202424 Gibl 2025Dearbhaichte
$160,014
Ìre III
Sterling, VA1 Dàmh 20242 Gibl 2025Dearbhaichte
$166,468
Ìre IV
Sterling, VA20 Cèit 202417 Samh 2024Dearbhaichte
$140,000
Ìre IV
Sterling, VA18 Dàmh 202312 Gibl 2024Dearbhaichte

Obraichean eile aig Asurion, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).