Dachaigh › Luchd-obrach › Atlas Renewable Energy USA LLC
Atlas Renewable Energy USA LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Atlas Renewable Energy USA LLC 13 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 12. Tuarastal meadhanach a chaidh a thabhann: $158,194.
A bheil Atlas Renewable Energy USA LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Atlas Renewable Energy USA LLC 13 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 7 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Head of Learning and Development | 4 | $150,000 |
| Head of Corporate Controlling and Accounting | 2 | $220,000 |
| People Director | 2 | $200,542 |
| Engineering Director (Renewable Engergy) | 1 | $151,237 |
| Engineering Director (Renewable Energy) | 1 | $165,152 |
| Managing Director Capital Solutions | 1 | $300,000 |
| Manager, M&A and Capital Solutions | 1 | $140,000 |
| Chief Financial Officer | 1 | $420,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $151,237 |
| FY2024 | 5 | $165,152 |
| FY2025 | 2 | $185,542 |
| FY2026 | 2 | $285,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Head of Learning and Development | $150,000 H-1B1 (Sile) · Ìre III | Plantation, FL | 7 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| Chief Financial Officer | $420,000 Ìre IV | Plantation, FL | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Manager, M&A and Capital Solutions | $140,000 Ìre II | Plantation, FL | 30 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| People Director | $231,084 Ìre IV | Plantation, FL | 8 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Head of Learning and Development | $150,000 H-1B1 (Sile) · Ìre III | Plantation, FL | 30 Lùna 2024 | 1 Sult 2024 | Dearbhaichte |
| Managing Director Capital Solutions | $300,000 H-1B1 (Sile) · Ìre III | Plantation, FL | 3 Iuch 2024 | 2 Sult 2024 | Dearbhaichte |
| Engineering Director (Renewable Energy) | $165,152 H-1B1 (Sile) · Ìre II | Plantation, FL | 25 Gibl 2024 | 1 Iuch 2024 | Dearbhaichte |
| People Director | $170,000 H-1B1 (Sile) · Ìre IV | Plantation, FL | 18 Gibl 2024 | 1 Iuch 2024 | Dearbhaichte |
| Head of Learning and Development | $150,000 H-1B1 (Sile) · Ìre III | Miami, FL | 4 Dùbh 2023 | 2 Faoi 2024 | Dearbhaichte |
| Head of Corporate Controlling and Accounting | $220,000 H-1B1 (Sile) · Ìre IV | Miami, FL | 26 Iuch 2023 | 1 Lùna 2023 | Dearbhaichte |
| Head of Corporate Controlling and Accounting | $230,000 H-1B1 (Sile) · Ìre IV | Miami, FL | 25 Iuch 2023 | 1 Lùna 2023 | Air a tharraing air ais |
| Engineering Director (Renewable Engergy) | $151,237 H-1B1 (Sile) · Ìre II | Miami, FL | 28 Màrt 2023 | 22 Lùna 2023 | Dearbhaichte |
| Head of Learning and Development | $150,000 H-1B1 (Sile) · Ìre III | Miami, FL | 30 Dùbh 2022 | 1 Faoi 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).