Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Atos Syntel Inc › Quality Assurance Analyst

Quality Assurance Analyst aig Atos Syntel Inc: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Quality Assurance Analyst aig Atos Syntel Inc. Tuarastal bunasach meadhanach $99,986; leth meadhanach $91,010–$117,463.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$99,986
Leath mheadhanach nan tuarastalan$91,010–$117,463
Ceudail 10mh–90mh$82,118–$121,992

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$117,463
FY20243$89,981
FY20252$96,013

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$99,986
Ìre II
El Dorado Hills, CA26 Cèit 202530 Sult 2025Dearbhaichte
$92,040
Ìre II
El Dorado Hills, CA26 Gearr 20255 Màrt 2025Dearbhaichte
$74,776
Ìre II
Phoenix, AZ21 Ògmh 20241 Dàmh 2024Dearbhaichte
$89,981
Ìre II
El Dorado Hills, CA17 Gibl 202424 Gibl 2024Dearbhaichte
$112,299
Ìre II
Dublin, CA30 Sult 20237 Dàmh 2023Dearbhaichte
$121,992
Ìre II
El Dorado Hills, CA22 Lùna 202329 Lùna 2023Dearbhaichte
$114,982
Ìre II
El Dorado Hills, CA17 Lùna 202324 Lùna 2023Dearbhaichte
$122,067
Ìre II
El Dorado Hills, CA31 Iuch 20237 Lùna 2023Dearbhaichte
$98,342
Ìre II
Alpharetta, GA21 Ògmh 202328 Ògmh 2023Dearbhaichte
$82,118
Ìre II
El Dorado Hills, CA8 Gearr 202315 Gearr 2023Dearbhaichte
$119,944
Ìre II
El Dorado Hills, CA3 Samh 202210 Samh 2022Dearbhaichte

Quality Assurance Analyst aig gach neach-fastaidh →

Obraichean eile aig Atos Syntel Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).