Dachaigh › Luchd-obrach › Austin Building and Design Inc.
Austin Building and Design Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Austin Building and Design Inc. 6 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 6. Tuarastal meadhanach a chaidh a thabhann: $108,500.
A bheil Austin Building and Design Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Austin Building and Design Inc. 6 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 30 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Structural Designer | 1 | $105,000 |
| Construction Project Engineer II | 1 | $95,400 |
| Senior Electrical Engineer | 1 | $141,440 |
| Structural Engineer | 1 | $98,270 |
| Architect IV | 1 | $115,676 |
| Assistant Project Manager | 1 | $112,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $100,200 |
| FY2025 | 2 | $119,855 |
| FY2026 | 2 | $113,838 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Assistant Project Manager | $112,000 Ìre III | Portage, MI | 30 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Architect IV | $115,676 Ìre IV | Cleveland, OH | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Structural Engineer | $98,270 Ìre III | Cleveland, OH | 14 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Electrical Engineer | $141,440 Ìre IV | Cleveland, OH | 25 Gearr 2025 | 17 Màrt 2025 | Dearbhaichte |
| Construction Project Engineer II | $95,400 Ìre I | Portage, MI | 31 Iuch 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Structural Designer | $105,000 Ìre II | Chicago, IL | 23 Gearr 2023 | 2 Màrt 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).