Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Bank of America N.a. › Vice President; Infrastructure Engineer Lead

Vice President; Infrastructure Engineer Lead aig Bank of America N.a.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Vice President; Infrastructure Engineer Lead aig Bank of America N.a.. Tuarastal bunasach meadhanach $147,500; leth meadhanach $142,350–$151,598.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$147,500
Leath mheadhanach nan tuarastalan$142,350–$151,598
Ceudail 10mh–90mh$130,034–$160,645

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$137,920
FY20243$145,000
FY20253$142,000
FY20262$158,225

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$150,000
Ìre IV
Charlotte, NC15 Ògmh 202610 Dùbh 2026Dearbhaichte
$166,450
Ìre IV
Atlanta, GA31 Cèit 202626 Samh 2026Dearbhaichte
$142,000
Ìre II
Plano, TX4 Gearr 20252 Lùna 2025Dearbhaichte
$130,500
Ìre III
Charlotte, NC24 Dàmh 202425 Gibl 2025Dearbhaichte
$152,131
Ìre IV
Pennington, NJ16 Dàmh 20243 Gibl 2025Dearbhaichte
$143,400
Ìre IV
Charlotte, NC23 Iuch 202417 Faoi 2025Dearbhaichte
$145,000
Ìre IV
Atlanta, GA8 Cèit 20241 Dàmh 2024Dearbhaichte
$160,000
Ìre IV
Atlanta, GA3 Samh 202327 Samh 2023Dearbhaichte
$150,000
Ìre II
Jersey City, NJ13 Gearr 202312 Lùna 2023Dearbhaichte
$125,840
Ìre III
Charlotte, NC13 Gearr 202312 Lùna 2023Dearbhaichte

Obraichean eile aig Bank of America N.a.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).