Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Bank of America N.a. › Vice President; Site Reliability Engineer II

Vice President; Site Reliability Engineer II aig Bank of America N.a.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Vice President; Site Reliability Engineer II aig Bank of America N.a.. Tuarastal bunasach meadhanach $136,246; leth meadhanach $134,623–$140,514.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$136,246
Leath mheadhanach nan tuarastalan$134,623–$140,514
Ceudail 10mh–90mh$133,557–$148,520

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$134,992
FY20241$132,614
FY20262$148,520

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$141,518Plano, TX8 Dùbh 202521 Cèit 2026Dearbhaichte
$155,522
Ìre IV
Jacksonville, FL3 Dùbh 202515 Cèit 2026Dearbhaichte
$132,614
Ìre III
Charlotte, NC30 Cèit 20241 Iuch 2024Dearbhaichte
$134,500
Ìre II
Jersey City, NJ13 Màrt 202312 Sult 2023Dearbhaichte
$134,992
Ìre IV
Plano, TX23 Samh 202222 Cèit 2023Dearbhaichte
$137,500
Ìre IV
Jacksonville, FL17 Samh 202216 Cèit 2023Dearbhaichte

Obraichean eile aig Bank of America N.a.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).