Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Bank of America N.a. › Vice President; Site Reliability Engineer Lead

Vice President; Site Reliability Engineer Lead aig Bank of America N.a.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Vice President; Site Reliability Engineer Lead aig Bank of America N.a.. Tuarastal bunasach meadhanach $165,000; leth meadhanach $160,600–$165,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$165,000
Leath mheadhanach nan tuarastalan$160,600–$165,000
Ceudail 10mh–90mh$154,577–$168,729

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20251$160,600
FY20264$165,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$171,215Jersey City, NJ23 Ògmh 202611 Sult 2026Dearbhaichte
$150,562
Ìre II
Jersey City, NJ5 Cèit 202611 Sult 2026Dearbhaichte
$165,000
Ìre IV
Charlotte, NC6 Faoi 202612 Faoi 2026Dearbhaichte
$165,000
Ìre IV
Charlotte, NC3 Dùbh 202512 Faoi 2026Dearbhaichte
$160,600
Ìre III
Jersey City, NJ4 Dàmh 20244 Gibl 2025Dearbhaichte

Obraichean eile aig Bank of America N.a.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).