Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › The Bank of New York Mellon › Vice President, Full-Stack Engineer I

Vice President, Full-Stack Engineer I aig The Bank of New York Mellon: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Vice President, Full-Stack Engineer I aig The Bank of New York Mellon. Tuarastal bunasach meadhanach $133,579; leth meadhanach $126,397–$142,746.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$133,579
Leath mheadhanach nan tuarastalan$126,397–$142,746
Ceudail 10mh–90mh$121,860–$150,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$121,493
FY20247$142,746
FY20252$130,587

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,587
Ìre IV
Lake Mary, FL29 Cèit 20251 Dàmh 2025Dearbhaichte
$130,587
Ìre IV
Lake Mary, FL7 Cèit 20251 Dàmh 2025Dearbhaichte
$142,746
Ìre IV
Lake Mary, FL23 Sult 202428 Faoi 2025Dearbhaichte
$150,000New York, NY18 Sult 202423 Sult 2024Dearbhaichte
$150,000New York, NY16 Sult 202423 Sult 2024Dearbhaichte
$136,571
Ìre IV
Pittsburgh, PA19 Lùna 20241 Gearr 2025Dearbhaichte
$142,746
Ìre IV
Lake Mary, FL15 Lùna 202428 Faoi 2025Dearbhaichte
$121,901
Ìre IV
Pittsburgh, PA2 Cèit 20241 Dàmh 2024Dearbhaichte
$125,000
Ìre IV
Lake Mary, FL9 Dàmh 202313 Dàmh 2023Dearbhaichte
$121,493
Ìre IV
Lake Mary, FL22 Sult 20235 Dàmh 2023Dearbhaichte

Obraichean eile aig The Bank of New York Mellon

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).