Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Battelle Memorial Institute › Earth Scientist (Civil Engineer)

Earth Scientist (Civil Engineer) aig Battelle Memorial Institute: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Earth Scientist (Civil Engineer) aig Battelle Memorial Institute. Tuarastal bunasach meadhanach $107,446; leth meadhanach $94,044–$119,344.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$107,446
Leath mheadhanach nan tuarastalan$94,044–$119,344
Ceudail 10mh–90mh$86,555–$128,070

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$93,786
FY20242$116,229
FY20251$133,682
FY20261$90,429

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$90,429
Ìre I
Seattle, WA11 Cèit 202624 Sult 2026Dearbhaichte, an uair sin air a tharraing air ais
$133,682
Ìre III
Seattle, WA7 Lùna 20255 Dàmh 2025Dearbhaichte
$122,458
Ìre III
Richland, WA16 Gibl 20241 Sult 2024Dearbhaichte
$110,000
Ìre II
College Park, MD15 Gibl 202416 Ògmh 2024Dearbhaichte
$82,681
Ìre I
Seattle, WA27 Màrt 202324 Sult 2023Dearbhaichte
$104,891
Ìre II
Richland, WA22 Gearr 202315 Cèit 2023Dearbhaichte

Obraichean eile aig Battelle Memorial Institute

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).