Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Beacon Hill Solutions Group LLC › IT Project Manager

IT Project Manager aig Beacon Hill Solutions Group LLC: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd IT Project Manager aig Beacon Hill Solutions Group LLC. Tuarastal bunasach meadhanach $93,600; leth meadhanach $68,640–$100,880.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$93,600
Leath mheadhanach nan tuarastalan$68,640–$100,880
Ceudail 10mh–90mh$67,808–$113,984

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20252$68,640
FY20265$93,600

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$66,560–$104,000
Ìre I
Allston, MA5 Cèit 20261 Dàmh 2026Dearbhaichte
$108,160–$145,600
Ìre III
Buffalo Grove, IL21 Gibl 202611 Cèit 2026Dearbhaichte
$93,600–$114,400
Ìre II
Irving, TX15 Gibl 20264 Cèit 2026Dearbhaichte
$122,720–$143,520
Ìre IV
Nashua, NH13 Gibl 202611 Cèit 2026Dearbhaichte
$93,600–$124,800
Ìre II
Irving, TX8 Gibl 202627 Gibl 2026Dearbhaichte
$68,640–$124,800
Ìre I
Bentonville, AR29 Iuch 202518 Lùna 2025Dearbhaichte
$68,640–$124,800
Ìre I
Bentonville, AR16 Iuch 202518 Lùna 2025Dearbhaichte

IT Project Manager aig gach neach-fastaidh →

Obraichean eile aig Beacon Hill Solutions Group LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).