Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Beeline Group, LLC

Beeline Group, LLC: Tuarastalan H-1B agus taic bhìosa

Chuir Beeline Group, LLC 5 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 5. Tuarastal meadhanach a chaidh a thabhann: $69,826.

Iarrtasan (LCAs)5
Dearbhaichte5
Seòladh an neach-fhastaidhElk Grove Village, IL
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$69,826
Leath mheadhanach nan tuarastalan$69,000–$120,000
Ceudail 10mh–90mh$60,600–$126,000

A bheil Beeline Group, LLC a’ toirt taic do bhìosaichean H-1B?

Chuir Beeline Group, LLC 5 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 22 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Project Manager2$62,000
Director of Project Management1$120,000
Project Engineer1$69,826
Quality Assurance Test Lead1$130,000

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$55,000
FY20252$94,913
FY20262$99,500

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Quality Assurance Test Lead$130,000–$150,000
Ìre II
Las Vegas, NV22 Gibl 20261 Dàmh 2026Dearbhaichte
Project Manager$69,000–$75,000
Ìre I
Elk Grove Village, IL22 Gibl 20261 Dàmh 2026Dearbhaichte
Project Engineer$69,826
Ìre I
Elk Grove Village, IL1 Cèit 20251 Dàmh 2025Dearbhaichte
Director of Project Management$120,000
Ìre III
Elk Grove Village, IL13 Faoi 202527 Faoi 2025Dearbhaichte
Project Manager$55,000
Ìre II
Elk Grove Village, IL21 Gearr 202319 Lùna 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).