Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Birlasoft Solutions, Inc. › Technical Manager

Technical Manager aig Birlasoft Solutions, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Technical Manager aig Birlasoft Solutions, Inc.. Tuarastal bunasach meadhanach $117,000; leth meadhanach $109,375–$130,234.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$117,000
Leath mheadhanach nan tuarastalan$109,375–$130,234
Ceudail 10mh–90mh$108,618–$152,308

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$130,234
FY20262$112,557

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$108,114Cookeville, TN23 Ògmh 202630 Ògmh 2026Dearbhaichte
$117,000
Ìre II
Houston, TX5 Gearr 202616 Gearr 2026Dearbhaichte
$167,024
Ìre IV
Renton, WA23 Sult 202530 Sult 2025Dearbhaichte
$130,234Renton, WA21 Lùna 20251 Samh 2025Dearbhaichte
$109,375
Ìre II
Houston, TX15 Faoi 202522 Faoi 2025Dearbhaichte

Technical Manager aig gach neach-fastaidh →

Obraichean eile aig Birlasoft Solutions, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).