Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › BlueWave Project Development LLC

BlueWave Project Development LLC: Tuarastalan H-1B agus taic bhìosa

Chuir BlueWave Project Development LLC 8 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 7. Tuarastal meadhanach a chaidh a thabhann: $106,605.

Iarrtasan (LCAs)8
Dearbhaichte7
Seòladh an neach-fhastaidhBoston, MA
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$106,605
Leath mheadhanach nan tuarastalan$98,302–$162,500
Ceudail 10mh–90mh$85,500–$253,000

A bheil BlueWave Project Development LLC a’ toirt taic do bhìosaichean H-1B?

Chuir BlueWave Project Development LLC 8 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 23 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Project Engineer, Execution3$106,605
Engineer, Interconnection1$90,000
Director, Grid Integration1$185,000
Battery Energy Storage Systems (BESS) Integration Manager1$140,000
Chief Operating Officer1$355,000
Design Engineer I1$78,750

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$90,000
FY20254$162,500
FY20263$106,605

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Project Engineer, Execution$106,605
Ìre I
Boston, MA23 Gibl 20261 Dàmh 2026Dearbhaichte
Project Engineer, Execution$106,605
Ìre I
Boston, MA20 Gibl 20261 Dàmh 2026Air a tharraing air ais
Project Engineer, Execution$106,605
Ìre I
Boston, MA10 Gibl 20261 Dàmh 2026Dearbhaichte, an uair sin air a tharraing air ais
Design Engineer I$78,750
Ìre I
Boston, MA2 Ògmh 20251 Dàmh 2025Dearbhaichte
Battery Energy Storage Systems (BESS) Integration Manager$140,000
Ìre I
Boston, MA27 Gearr 202510 Màrt 2025Dearbhaichte
Chief Operating Officer$355,000
Ìre III
Boston, MA24 Gearr 202511 Lùna 2025Dearbhaichte
Director, Grid Integration$185,000
Ìre IV
Boston, MA21 Lùna 20243 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
Engineer, Interconnection$90,000
Ìre I
Boston, MA16 Gearr 202426 Gearr 2024Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).