Dachaigh › Luchd-obrach › BMO Bank N.A. › Specialist III-IC Development
Specialist III-IC Development aig BMO Bank N.A.: Tuarastalan H-1B
11 iarrtasan cumhaichean-obrach airson an dreuchd Specialist III-IC Development aig BMO Bank N.A.. Tuarastal bunasach meadhanach $125,307; leth meadhanach $120,422–$135,190.
Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$125,307
Leath mheadhanach nan tuarastalan$120,422–$135,190
Ceudail 10mh–90mh$118,539–$143,416
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 6 | $122,751 |
| FY2025 | 3 | $126,321 |
| FY2026 | 2 | $123,806 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $125,307 | Mechanicsville, VA | 22 Cèit 2026 | 21 Lùna 2026 | Dearbhaichte |
| $122,304–$147,969 Ìre IV | Tempe, AZ | 23 Dùbh 2025 | 19 Faoi 2026 | Dearbhaichte |
| $123,265–$151,757 | Phoenix, AZ | 3 Màrt 2025 | 6 Lùna 2025 | Dearbhaichte |
| $126,321–$156,880 | Tempe, AZ | 20 Gearr 2025 | 1 Lùna 2025 | Dearbhaichte |
| $151,757–$162,044 Ìre IV | Tempe, AZ | 24 Sult 2024 | 18 Màrt 2025 | Dearbhaichte |
| $126,963–$127,980 | San Jose, CA | 30 Iuch 2024 | 12 Lùna 2024 | Dearbhaichte |
| $114,485–$115,174 | Chicago, IL | 28 Ògmh 2024 | 28 Dùbh 2024 | Dearbhaichte |
| $118,539–$132,964 Ìre IV | Tempe, AZ | 20 Ògmh 2024 | 22 Iuch 2024 | Dearbhaichte |
| $143,416–$153,416 Ìre IV | Tempe, AZ | 6 Ògmh 2024 | 6 Ògmh 2024 | Dearbhaichte |
| $118,539–$151,783 Ìre IV | Glendale, AZ | 21 Samh 2023 | 27 Samh 2023 | Dearbhaichte |
| $143,416–$144,970 Ìre IV | Tempe, AZ | 17 Samh 2023 | 27 Samh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
Obraichean eile aig BMO Bank N.A.
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).