Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Boston Consulting Group, Inc. › Principal - Engineering

Principal - Engineering aig Boston Consulting Group, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Principal - Engineering aig Boston Consulting Group, Inc.. Tuarastal bunasach meadhanach $215,000; leth meadhanach $215,000–$236,205.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$215,000
Leath mheadhanach nan tuarastalan$215,000–$236,205
Ceudail 10mh–90mh$215,000–$246,222

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$236,205
FY20242$215,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$215,000–$268,400
Ìre IV
Washington, DC26 Lùna 20249 Sult 2024Dearbhaichte
$215,000–$268,400
Ìre IV
Manhattan Beach, CA27 Sult 20231 Gearr 2024Dearbhaichte
$215,000–$252,900
Ìre IV
New York, NY6 Iuch 20231 Lùna 2023Dearbhaichte
$252,900–$293,400
Ìre IV
New York, NY7 Gibl 202310 Gibl 2023Dearbhaichte
$236,205–$281,700
E-3 · Ìre III
Washington, DC9 Faoi 202323 Faoi 2023Dearbhaichte

Obraichean eile aig Boston Consulting Group, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).