Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Box, Inc. › Engineering Manager II

Engineering Manager II aig Box, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Manager II aig Box, Inc.. Tuarastal bunasach meadhanach $248,706; leth meadhanach $240,001–$267,628.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$248,706
Leath mheadhanach nan tuarastalan$240,001–$267,628
Ceudail 10mh–90mh$233,990–$274,186

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$248,768
FY20241$230,859
FY20252$255,518
FY20262$261,550

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$274,456
Ìre IV
Redwood City, CA28 Cèit 202625 Dàmh 2026Dearbhaichte
$248,643
Ìre II
Redwood City, CA20 Màrt 20261 Gibl 2026Dearbhaichte
$237,120
Ìre III
Redwood City, CA25 Gibl 202525 Dàmh 2025Dearbhaichte
$273,915
Ìre IV
Redwood City, CA17 Màrt 202519 Cèit 2025Dearbhaichte
$230,859
Ìre III
Redwood City, CA9 Cèit 202425 Dàmh 2024Dearbhaichte
$248,768
Ìre IV
Redwood City, CA15 Ògmh 202325 Dàmh 2023Dearbhaichte

Engineering Manager II aig gach neach-fastaidh →

Obraichean eile aig Box, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).