Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Brillio, LLC › Lead Engineer, XT

Lead Engineer, XT aig Brillio, LLC: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Lead Engineer, XT aig Brillio, LLC. Tuarastal bunasach meadhanach $105,000; leth meadhanach $100,500–$113,000.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$105,000
Leath mheadhanach nan tuarastalan$100,500–$113,000
Ceudail 10mh–90mh$85,613–$124,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$104,032
FY20243$102,000
FY20252$116,345

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$105,997
Ìre II
Clayton, MO13 Ògmh 202520 Ògmh 2025Dearbhaichte
$126,693
Ìre II
Santa Clara, CA16 Samh 202416 Samh 2024Dearbhaichte
$78,000
Ìre II
Santa Monica, CA20 Cèit 20241 Dàmh 2024Dearbhaichte
$116,000
Ìre II
Austin, TX20 Cèit 20241 Dàmh 2024Dearbhaichte
$102,000
Ìre II
Coppell, TX20 Cèit 20241 Dàmh 2024Dearbhaichte
$124,000
Ìre II
Sunnyvale, CA21 Sult 20231 Samh 2023Dearbhaichte
$103,064–$108,150
Ìre III
Irving, TX14 Sult 202321 Sult 2023Dearbhaichte
$85,613
Ìre II
Tampa, FL9 Ògmh 202316 Ògmh 2023Dearbhaichte
$110,000
Ìre II
Dallas, TX17 Cèit 20231 Dàmh 2023Dearbhaichte
$99,000
Ìre II
West Chester, PA2 Cèit 20231 Dàmh 2023Dearbhaichte
$105,000
Ìre II
San Diego, CA2 Cèit 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig Brillio, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).